These are pictures of our bathroom in progress. Frank is finishing up the drywalling here. It looks good except for the pink! Both the tiles and walls in this bathroom were pink. We are not settled on how to redo the floor yet in a simple/inexpensive way. We redid this bathroom in order to have space for a stairway to the attic. We made a room the entire length of the attic, we didnt finish drywalling up there but its servicable. The attic is where my work things are stored, fabric and inventory mostly. The stairway is where the master bath was. And on the other side of the master bath was a very large closet which we took part of for the bathtub/shower. So now their is a new wall in the closet and the bathroom! We did all the work, though Frank has done more than I by far. Today he finished the hall ceiling where the pull down ladder used to be for the attic.
We hope that the attic and redone bathroom will attract buyers. We also tiled the kitchen and put wood laminant throughout the living room and hall. There is a very nice new dishwasher and we have had work done on the heating and cooling unit. We plan to list soon, a lot of mudding and painting for me to do first!
No comments:
Post a Comment